Infrastructure Pipeline capacity expansion

Beira-Harare pipeline capacity jumps 67%

Two presidents approved a 67% capacity expansion of the CPMZ pipeline along the Beira-Harare fuel corridor. This strategic move directly strengthens Zimbabwe's energy security, aiming to increase annual transport capacity from 3 million to 5 million cubic metres. The project notably bypasses Beira's congested port infrastructure, representing a major shift in regional fuel logistics.

9
← Back to Home