Mining Redwing Restart

Namib Fast-Tracks Redwing Mine Restart

Namib has fast-tracked the long-awaited restart of Redwing Mine after completing dewatering, refurbishing critical infrastructure and resuming crushing activities and operational readiness. The accelerated development programme, reported by Zimbabwe Independent, brings the operation closer to resuming production. The milestone follows a prolonged care-and-maintenance period and previous efforts to revive the gold mine amid shifting ownership and investment. Redwing’s return would add to Zimbabwe’s gold output, but the mine has historically struggled with chronic flooding, technical equipment failures and fresh capital constraints. The immediate horizon is operational discipline. Namib must secure reliable funding, maintain strict safety standards and avoid the costly production delays that have repeatedly further derailed similar restarts again.

← Back to Home